Select a language:
Showing: 871 - 880 of 4815 results

San Juan Creek Flood Risk Management Feasibility Study

The San Juan Creek Flood Risk Management Feasibility Study is a joint study between the United States Army Corps of Engineers and the Orange County Flood Control District. The purpose of this…

Projects Studies

OC Infrastructure Programs manages OC Public Works' Road and Bridge, Flood, and Bikeway Projects approved by the County of Orange Board of Supervisors and listed in the 7-Year…

Project Cost and Schedule

SAR Projects involving OCFCD Year Began Estimated Year Complete Total Cost…

Santiago Creek

U.S. Army Corps of Engineers Santiago Creek Project  Santa Ana River Mainstem (SARM) Santiago Creek Flood Risk Management Project

Laguna Canyon Channel Replacement Project

Fly over the project in construction with our OC Survey team. March 2023.

Huntington Beach Channel Talbert Channel Sheet Pile Repair Project

See the project process from the sky with OC Public Works! (Drone video by OC Survey, October 24, 2022.)

Online Manuals

Several of these manuals are available both in their entirety and broken down into sections for easier downloading.Title Computer Aided Design (CAD) Standards Manual (Version 1.0 - January 2023)…

Project Alignment

The proposed 54-inch-diameter pipeline will tie into the existing SARI Line just upstream of the existing metering station at the Green River Golf Club. The pipeline will then cross the golf course…