Select a language:
Showing: 1971 - 1980 of 11002 results

Project Alignment

The proposed 54-inch-diameter pipeline will tie into the existing SARI Line just upstream of the existing metering station at the Green River Golf Club. The pipeline will then cross the golf course…

Standard Plans Specifications

OC Public Works Standard Plans Caltrans Standard Specifications Caltrans Standard Plans Caltrans Standard Details APWA Standard Plans (Purchase) and Green Book (Purchase) If there are any…

EMPTY FIELD

EMPTY FIELD

Santa Ana River Project

Introduction The Santa Ana River Mainstem Project is designed to provide flood protection to the growing urban communities in Orange, Riverside and San Bernardino Counties . The proposed…

EMPTY FIELD

EMPTY FIELD

Catch Basins

Drains The County of Orange has over 145 miles of underground storm drain facilities. OC Operations & Maintenance is responsible for inspection, maintenance and repair of the storm drain…

Urban Runoff Diversions

The Pump Station O&M Team is responsible for the operation and maintenance of the County's urban runoff diversions and run off filtration systems. Working with the OCSD to divert urban runoff…

Service Center

Select from the options to the left for services provided

Pump Stations Maintenance

Flood control is provided by a system of levees, channels and storm drains. All stormwater runoff is conveyed by gravity through a system of drainage lines and canals into the suction bays of various…

General Maintenance

The maintained road system within the unincorporated County of Orange is compromised of 340 miles of road. There are many private streets within the unincorporated portions of the County; these…